WorkFlow 5.1, Build #37 | 1/27/2011

Summary: Build WW 2.0 site tracked and defined on HWS build page. Tracks and develops sabbatical work flow: Sets up WebWorks 2.0. Build site as my application, for my needs (Rework). Coordinate with Axim list.

Active Build Apps: PW HQ | HWS Build | WW Tracker | WW Log | EoS Build

Build Table 12/8/2010

110 ess 2.0 ess build | absorb Montague/Daly I and II | add commons, strategy, eco-economics
130 sabbatical report and narrative Sabbatical = EoS + ESS2 + HWS | narrative from takenote
300 == 2nd tier jobs == =================================
320 ATN 0.1 MESSAGE MIKE: RAD build from storyboard, version in NTP: quick overview
600 == hold these jobs == ================================
610 ebook paratext new construction: ATN, ESS 2.0 + paratexts
640 build of W>E use essay | frames global crisis, adds heft | may use in eos
prototype build method (ess next)

The World Sustainability Web Site | © Wayne Hayes, Ph.D.
Initialized: 9/22/2010 | Last Update: 08/29/2013